Fairmont Consulting Completes Comprehensive Market Study
Released
Released
Announcement PDF
ASX Announcement | 8 February 2024
Amaero International Limited (ASX:3DA)
Fairmont Consulting Completes Comprehensive Market Study
•
C103 PBF powder demand expected to grow to 105 tonnes in FY2028 with
demand growth estimated at 62% CAGR for 5 year period ending FY2028. Demand
driven by investment cycle in hypersonics, strategic missiles, space launch and
satellites
•
Survey of C103 PBF powder price indicates range of $4,150 to $5,385 / kg with
order lead times of 12-24 months
•
Amaero positioning to be largest and most responsive U.S. domestic producer of
C103 and high-value specialty alloys
•
Planned production of C103 and high-value specialty alloy powder is expected to
increase revenue and to accelerate path to profitability
•
Amaero secures 2.5 tonnes of C103 feedstock
Amaero International Limited (ASX:3DA) (“Amaero” or “the Company”) is pleased to announce that
Fairmont Consulting Group LLC (“Fairmont”) has completed a comprehensive market study commissioned
by Amaero of Niobium C103 alloy (“Nb C103” or “C103”) and other high-value specialty materials used in
mission-critical defence and space applications. Fairmont is a leading specialist providing Aerospace and
Defence (“A&D”) and government market insights, engaged by Amaero to provide a detailed independent
market assessment evaluating the current C103 market landscape and anticipated future demand.
The 72-page comprehensive market study and accompanying proprietary market model provides key details
and analysis for 550 discrete programs in hypersonics, strategic missiles, space launch and satellite
programs. The study and supporting analysis provide Amaero with a granular, program-by-program study of
demand signals, market supply powder pricing and feedstock costs, as well as an analysis of Amaero
market positioning and go-to-market recommendations.
For the purpose of strategic planning and financial analysis, Amaero has incorporated key assumptions and
financial drivers from the market study. For corporate planning purposes, the Company has allocated
production based on Fairmont’s estimated demand for C103 powder (see Exhibit 8) and Fairmont’s
estimated achievable market share for Amaero. The estimated market share takes into consideration current
market producers, the market preference for U.S. domestic production and market dynamics for low volume,
high-value specialty alloy. Though Amaero does not provide financial guidance, we are providing investors
with certain key assumptions and key financial performance drivers that are supported by the Fairmont
Consulting report, other independent reports referenced in announcement and Amaero’s direct discussions
with numerous stakeholders. The expansion of Amaero’s operations to include four atomisers and the
related capital investment is summarized in Exhibit 14. The capital expenses planned for FY2025–FY2027
remain subject to Board approval and final investment decision is expected by end of FY2024.
Fairmont estimates the demand for C103 PBF powder in FY2025 at 25 tonnes with estimated demand
growing to 105 tonnes in FY2028 for a 62% CAGR over the 5-year period ending FY2028. Fairmont’s
survey of current C103 powder price reflects a range of $4,150 / kg to $5,385 / kg (US$2,700 / kg to
1
Source: Fairmont Consulting Group Report; ‘State of the PM Industry in North America—2023 June 2023’
Metal Powder Industries Federation; ‘Metal Additive Goes Full Scale’ SmarTech Analysis Core Metal AM Advisory Service.
Note: Values in AUD unless otherwise noted; assumed AUD:USD rate of 0.65.
US$3,500 / kg) with order lead times estimated at 12–24 months.
Amaero is pursuing a strategy of prioritising production of C103, development refractory alloys, other highvalue specialty alloys and Ti-64 powder production, to uniquely position the Company as a U.S. domestic,
agile and scalable producer of high-value, specialty powder for additive manufacturing of mission-critical
components for the defence, space and aviation industries. Amaero estimates its total production capacity of
powder for powder bed fusion (“PBF”) applications as follows:
Amaero Estimated PBF Powder Production Schedule
(FYE 06/30; Figures in tonnes) (Amounts are rounded)
FY2025E
-
FY2026E
Total PBF Production
-
101
101
20
10
EIGA #4
EIGA #2
EIGA #1
EIGA #4
EIGA #3
EIGA #2
EIGA #1
EIGA #4
EIGA #3
11
EIGA #2
EIGA #1
17
101
67
EIGA #3
96
81
FY2027E
Steady-State Production
Note, Steady-State Production indicates expected capacity production to be achieved after FY2027.
Amaero remains on schedule regarding the fit out of its headquarters in McDonald, Tennessee and
associated installation and commissioning of the first atomiser (“EIGA #1”). Installation is expected to begin
in late February with commissioning expected by June 2024. For the purpose of qualification, Amaero
expects to produce C103 powder beginning in Q1 FY2025 and to commence commercial sales in Q3
FY2025. In addition to commercial sales of C103, we anticipate utilising excess capacity to produce
development refractory alloys, other high-value specialty alloys and Ti-64 powders in FY2025.
Amaero recently signed a supply agreement (purchase order) for 2.5 tonnes of C103 feedstock. The C103
bar is scheduled to be delivered over the coming months and is anticipated to be sufficient for production of
C103 that’s planned for Q1/Q2 FY2025. The Company is advancing discussions with the same supplier to
provide a long-term supply agreement.
Amaero continues to advance commercial discussions with multiple parties for C103 offtake agreements.
To achieve the level of production indicated in this announcement through FY2027, funding for capital
expenses through the same period is estimated at $76 million (see Exhibit 14). As stated in prior ASX
announcement dated 29 January, the Company expects to achieve breakeven operations in CY2025.
Losses from operations in CY2024 are estimated at $14 million.
Amaero recently engaged a U.S.-based advisor to explore strategic equity financing alternatives. As it
pertains to retail and institutional investors in Australia, Amaero will continue to work with financial advisors
in Australia. Investors should note that there is no certainty that Amaero will be able to raise the amount of
funding when needed and it is possible that such funding may only be available on terms that may be
dilutive to or otherwise affect the value of Amaero’s shares.
Amaero continues to advance U.S. government funding discussions that include subsidized debt facilities
and government-funded grants. Amaero has engaged SMI, a leading government affairs consulting firm in
Washington DC, to advise Amaero as it pertains to government-funded grants and non-dilutive capital.
2
Source: Fairmont Consulting Group Report; ‘State of the PM Industry in North America—2023 June 2023’
Metal Powder Industries Federation; ‘Metal Additive Goes Full Scale’ SmarTech Analysis Core Metal AM Advisory Service.
Note: Values in AUD unless otherwise noted; assumed AUD:USD rate of 0.65.
Given the uncertainties involved, investors should not make any investment decisions based solely on the
results of the Fairmont market study.
Amaero Chairman and CEO, Hank J. Holland stated, “We took bold and decisive steps over the past year
to position Amaero as the largest and most responsive U.S. domestic producer of C103 and other high-value
specialty alloy powders. The Fairmont Consulting market report validates the strategic direction and
provides important market signals for demand, supply and pricing. The report also provides important
insights at the program-level that will assist the business development strategy. Amaero has an opportunity
to play an important role in re-shoring highly strategic industrial base capabilities to the U.S. and to
contribute to a more resilient and scalable supply chain for defence production and for the space ecosystem.
We expect that prioritising the production of C103 and high-value specialty alloy powders will materially
increase revenue trajectory and will accelerate the path to profitability.”
Investor Briefing
Amaero Chairman and CEO, Hank Holland, will host an investor briefing on Tuesday, 13 February at
11:00am AEDT.
Mr. Holland will take questions following the formal presentation. The investor briefing will be recorded and
posted to Amaero’s website.
To pre-register for the briefing please use the link below:
https://janemorganmanagement-au.zoom.us/webinar/register/WN_xP3-zn05SKu1F7sypbe2bg
After registering you will receive a confirmation e-mail with information about joining the briefing.
3
Source: Fairmont Consulting Group Report; ‘State of the PM Industry in North America—2023 June 2023’
Metal Powder Industries Federation; ‘Metal Additive Goes Full Scale’ SmarTech Analysis Core Metal AM Advisory Service.
Note: Values in AUD unless otherwise noted; assumed AUD:USD rate of 0.65.
For further information, please contact:
Amaero International Limited (ASX:3DA)
Jane Morgan Management
Hank J. Holland
Jane Morgan
Chairman and CEO
Director
hank.holland@amaeroinc.com
jm@janemorganmanagement.com.au
About Amaero International Limited (ASX:3DA)
Amaero International Limited is an ASX-listed company focused on high-value refractory, specialty alloy
and titanium powder production for additive manufacturing of mission-critical components utilised by the
defence, space and aviation industries.
For further information, please visit: https://www.amaeroinc.com
For more information
Follow us on X
Subscribe on our YouTube
Follow us on LinkedIn
Subscribe to our mailing list to receive updates
Visit our investor website: https://www.amaeroinc.com
This ASX announcement has been authorised by the Board of Amaero International Limited (ASX:3DA)
4
Source: Fairmont Consulting Group Report; ‘State of the PM Industry in North America—2023 June 2023’
Metal Powder Industries Federation; ‘Metal Additive Goes Full Scale’ SmarTech Analysis Core Metal AM Advisory Service.
Note: Values in AUD unless otherwise noted; assumed AUD:USD rate of 0.65.
Legal disclaimer:
This announcement has been prepared by Amaero International Limited ACN 633 541 634 (“Amaero” or the “Company”)
and does not constitute or form part of, and should not be construed as, an offer, solicitation or invitation to subscribe for,
underwrite or otherwise acquire, any securities of Amaero or any member of its group nor should it or any part of it form
the basis of, or be relied on in connection with, any contract to purchase or subscribe for any securities of Amaero or any
member of its group, nor shall it or any part of it form the basis of or be relied on in connection with any contract or
commitment whatsoever.
This announcement is not a prospectus, product disclosure statement or other disclosure document under Australian law
(or any other law),and has not been lodged with the Australian Securities and Investments Commission (or any other
regulatory body in Australia or abroad). This announcement contains summary information about Amaero and its
activities, which is current as at the date of this announcement. The information included in this announcement is of a
general nature and does not purport to be complete nor does it contain all the information which a prospective investor
should consider when making an investment decision. Each recipient of this announcement should make its own
enquiries and investigations regarding all information in this announcement including but not limited to the assumptions,
uncertainties and contingencies which may affect future operations of Amaero and the impact that different future
outcomes may have on Amaero. This announcement has been prepared without taking account of any person’s
investment objectives, financial situation or particular needs. Before making an investment decision, prospective
investors should consider the appropriateness of the information having regard to their own objectives, financial situation
and needs, make their own assessment of the information and seek legal, financial, accounting and taxation advice
appropriate to their jurisdiction in relation to the information and any action taken on the basis of the information.
The information included in this announcement has been provided to you solely for your information and background
and is subject to updating, completion, revision and amendment and such information may change materially. Unless
required by applicable law or regulation, no person (including Amaero) is under any obligation to update or keep current
the information contained in this announcement and any opinions expressed in relation thereto are subject to change
without notice. No representation or warranty, express or implied, is made as to the fairness, currency, accuracy,
reasonableness or completeness of the information contained herein. Neither Amaero nor any other person accepts any
liability and Amaero, its related bodies corporate and their respective directors, officers and employees, to the maximum
extent permitted by law, expressly disclaim all liabilities for any loss howsoever arising, directly or indirectly, from this
announcement or its contents.
This announcement includes forward-looking statements that reflect Amaero’s intentions, beliefs or current expectations
concerning, among other things, Amaero’s results of operations, financial condition, liquidity, performance, prospects,
growth, strategies and the industry in which Amaero operates. These forward-looking statements are subject to risks,
uncertainties and assumptions and other factors, many of which are beyond the control of Amaero. Amaero cautions you
that forward-looking statements are not guarantees of future performance and that its actual results of operations,
financial condition, liquidity, performance, prospects, growth or opportunities and the development of the industry in
which Amaero operates may differ materially from those made in or suggested by the forward-looking statements
contained in this announcement. In addition, Amaero does not guarantee any particular rate of return or the performance
of Amaero nor does it guarantee the repayment or maintenance of capital or any particular tax treatment. Investors
should note that past performance may not be indicative of results or developments in future periods and cannot be
relied upon as an indicator of (and provides no guidance as to) Amaero’s future performance. Amaero, its related bodies
corporate and each of their respective directors, officers and employees expressly disclaim any obligation or undertaking
to review, update or release any update of or revisions to any forward-looking statements in this announcement or any
change in Amaero’s expectations or any change in events, conditions or circumstances on which these forward-looking
statements are based, except as required by applicable law or regulation.
This announcement and any materials distributed in connection with this announcement are not directed to, or intended
for distribution to or use by, any person or entity that is a citizen or resident or located in any locality, state, country or
other jurisdiction where such distribution, publication, availability or use would be contrary to law or regulation or which
would require any registration or licensing within such jurisdiction.
The distribution of this announcement in certain jurisdictions may be restricted by law and persons into whose
possession this announcement comes should inform themselves about, and observe any such restrictions.
5
Source: Fairmont Consulting Group Report; ‘State of the PM Industry in North America—2023 June 2023’
Metal Powder Industries Federation; ‘Metal Additive Goes Full Scale’ SmarTech Analysis Core Metal AM Advisory Service.
Note: Values in AUD unless otherwise noted; assumed AUD:USD rate of 0.65.
Fairmont Consulting Group Market Study
The 72-page comprehensive market study and accompanying proprietary market model provides key details
and analysis for 550 discrete programs in hypersonics, strategic missiles, space launch and satellite
programs. The study and supporting analysis provide Amaero with a granular, program-by-program study of
demand signals, market supply, powder pricing and feedstock costs, as well as an analysis and insights
pertaining to Amaero’s market positioning, market share opportunity and go-to-market strategy
High-temperature materials are required for numerous applications within the defence and space industries.
Development and production of these materials is a complex and resource-intense endeavor, and the
material applications are in severe, demanding conditions.
Aerospace manufacturing is increasingly adopting additive manufacturing (“AM”), particularly within
Amaero’s target use cases in highly engineered sub-segments of the market: hypersonics, strategic
missiles, space launch and satellite systems. AM is attractive to these markets due to its ability to create
complex geometry, cost profile at low volumes, and significant reduction in raw material usage. The ratio of
the amount of raw material originally acquired to the volume of material contained in the final part is the
‘Buy-to-Fly’ ratio. This metric is an important driver of total part cost, particularly when the raw material is
expensive. AM can reduce traditional manufacturing buy-to-fly ratios of 40:1 for machining and 15:1 for
forging to below 1.5:1 for AM - resulting in significant efficiencies during the design and manufacturing
process (source: Fairmont Consulting Group).
C103 is a high-performance, heat-resistant alloy comprised of 89% Niobium, 10% Hafnium and 1%
Titanium. Due to its superior refractory and conductivity properties, C103 is critical to a range of applications
in hypersonics, strategic missiles, space launch and satellite programs. Mission-critical applications that
include thermal protection and propulsion systems are well suited for additive manufacturing using C103 and
other refractory alloys. C103 is known for its strength and resistance at high temperatures, with a melting
point of ~2,350 degrees Celsius. The confluence of production-scale adoption of AM and the increasing
number of applications requiring high-temperature materials are creating a large market opportunity that
C103 PBF powder is well suited to address. The combination of C103’s long history as a highly capable
material and its ability to be additively produced bodes well for its share within the high-temperature material
markets.
Fairmont’s study and market model conclude that high-temperature material demand is forecast to double
over the 5-year period ending FY2028 for an estimated annual growth rate of 15%. The study reflects C103
in all forms (wrought and powder) is expected to take share from other high-temperature materials and
estimates that total C103 demand will grow at a higher rate of approximately 25% CAGR during the same
period. Based on the expected growth in demand for high-temperature materials coupled with expected
growth of AM insertion, Fairmont estimates that demand for C103 PBF powder will increase by four-fold
from an estimated demand of 25 tonnes in FY2025 to approximately 105 tonnes in FY2028. The
expected growth in demand reflects a 62% CAGR over the 5-year period ending FY2028 (See Exhibit
8).
The strong demand growth is driven by the U.S. military’s priority initiatives in the development and
production of hypersonic weapon platforms and strategic missiles, coupled with the strong investment cycle
in space launch and satellite programs. The current C103 powder market is underserved. Few suppliers are
qualified, and customers are faced with long lead times, inflexible production runs and high prices for C103
PBF powder today. As highlighted in the U.S. Department of Defense’s recently published 59-page National
Defense Industrial Strategy, improving the capability and resiliency of the defense production supply chain is
a national strategic imperative. As discussed with leading DoD funded research and development
laboratory, in order to accelerate adoption/insertion of additive manufacturing for high-temperature
applications, it’s a supply chain imperative that a U.S. domestic, agile and scalable producer of C103 and
specialty alloy PBF powder emerge.
6
Source: Fairmont Consulting Group Report; ‘State of the PM Industry in North America—2023 June 2023’
Metal Powder Industries Federation; ‘Metal Additive Goes Full Scale’ SmarTech Analysis Core Metal AM Advisory Service.
Note: Values in AUD unless otherwise noted; assumed AUD:USD rate of 0.65.
Exhibit 1: Fairmont Study Overview
Exhibit 2: Fairmont Market Model Detail
Fairmont leveraged U.S. DoD Future Years Defense Program (“FYDP”) budget data, market experts
possessing deep expertise of the programs in question, and Fairmont’s proprietary space launch forecast
models with details on launches and satellite quantities. By applying estimated weights on each system
based on DoD product specifications and academic research, as well as the percent weight of each product
7
Source: Fairmont Consulting Group Report; ‘State of the PM Industry in North America—2023 June 2023’
Metal Powder Industries Federation; ‘Metal Additive Goes Full Scale’ SmarTech Analysis Core Metal AM Advisory Service.
Note: Values in AUD unless otherwise noted; assumed AUD:USD rate of 0.65.
based on open-source data, a total high-temperature material market was derived for the target markets.
Within those forecasts, Fairmont then assessed the addressability of C103 as the material of choice. The
forecast period was FY2023–FY2028 (inclusive), unless otherwise noted, with a geographic focus solely on
the United States market. Demand for high-temperature materials across the four markets of interest is
projected to double in the five years ending FY2028 (U.S. Gov’t fiscal year ending September 30), resulting
in an estimated CAGR of 15% (see Exhibit 7). Several of the markets show outsized growth in demand,
underpinned by significant public and private investment.
Hypersonics
Hypersonic weapons require high-temperature materials for thermal protection systems including
applications in first and second-stage rocket nozzles of the launch and propulsion systems of the weapon.
Growth is driven by ramping production of boost-glide weapons such as the Army’s Long-Range Hypersonic
Weapon (“LRHW“) and the Navy’s Conventional Prompt Strike (“CPS”), and the development of air-breather
hypersonic missiles
The U.S. government’s priority focus and funding for the hypersonics market has resulted in a surge of
activity and development.
Strategic Missiles
Exhibit 3: Hypersonics
Exhibit 4: Strategic Missiles
Exhibit 5: Space Launch
Exhibit 6: Satellites
Strategic missiles require high-temperature
materials for their first-, second-, and thirdstage rocket nozzles. The missiles also require
high-temperature materials for their reentry
vehicles, which experience extreme
environments as they travel back through the
atmosphere. The U.S. is developing the
Sentinel platform to replace the 60-year-old
Minuteman Intercontinental Ballistic Missile
(“ICBM”) platform. The modernisation of the
United States’ nuclear triad via the Sentinel
program drives high-temperature material
requirement growth.
Space Launch
Space launch vehicles require hightemperature materials for their first- and
second-stage rocket motor nozzles, which
must endure extreme conditions during
launch. The space launch market is evolving
as additional suppliers enter the market and
the cost per launch decreases. C103 is wellestablished in this market for second-stage
rocket motor nozzle extenders that operate
after the core stage has successfully propelled
the rocket from the ground to approaching
orbit.
For space applications, C103 is commonly
used in a rocket’s engine expansion nozzle,
the bell-shaped nozzle visible at the aft end of
a rocket. C103 was used on the Apollo
program for the engine nozzle of the upper
8
Source: Fairmont Consulting Group Report; ‘State of the PM Industry in North America—2023 June 2023’
Metal Powder Industries Federation; ‘Metal Additive Goes Full Scale’ SmarTech Analysis Core Metal AM Advisory Service.
Note: Values in AUD unless otherwise noted; assumed AUD:USD rate of 0.65.
stage Service Propulsion Module that transited to the Moon.
Satellites
The market for high-temperature materials in the satellite market is developing as smaller, more
maneuverable designs are launched. High-temperature materials are required for the thruster nozzles of
satellites to maneuver in orbit. These in-space propulsion systems have unique requirements to operate in
the extreme environments of space. C103 is also used for the nozzles on satellite thrusters.
The growth of broadband communications constellations fuels demand for high-temperature materials, with
a shift from larger satellites to constellations of more numerous small satellites.
Exhibit 7: Estimated High-Temperature Material Demand by Sub-Market
9
Source: Fairmont Consulting Group Report; ‘State of the PM Industry in North America—2023 June 2023’
Metal Powder Industries Federation; ‘Metal Additive Goes Full Scale’ SmarTech Analysis Core Metal AM Advisory Service.
Note: Values in AUD unless otherwise noted; assumed AUD:USD rate of 0.65.
Exhibit 8: Estimate High-Temperature Material Demand by C103 Addressability
10
Source: Fairmont Consulting Group Report; ‘State of the PM Industry in North America—2023 June 2023’
Metal Powder Industries Federation; ‘Metal Additive Goes Full Scale’ SmarTech Analysis Core Metal AM Advisory Service.
Note: Values in AUD unless otherwise noted; assumed AUD:USD rate of 0.65.
Production Planning, Feedstock Cost and Powder Prices
Production across Amaero’s current and planned four atomisers is shaped by the following strategic plan:
i.
ii.
iii.
Prioritise C103 and development refractory alloys;
then, other high-value specialty alloys;
then, allocate excess production capacity to titanium alloys.
Amaero’s expected PBF powder yield is industry leading and estimated to be approximately double the yield
achieved by alternative atomisation technologies.
It takes approximately 20 months from purchase order to commissioning for each EIGA Premium. The EIGA
commissioning includes equipment assembly, followed by cold and hot testing. EIGA #1 assembly will
commence in February 2024 and commissioning is expected to occur in June 2024. Powder production and
qualification is expected to commence in Q1 FY2025, with the 1st shift of production scaling through Q4
FY2025. In FY2026, Amaero expects to ramp EIGA #1 production with two additional shifts of production.
Amaero believes qualification of C103 and high-value specialty alloys may be expedited due to lack of U.S.
domestic and customer responsive supplier alternatives. In anticipation of an estimated 12-18 month
qualification process for Ti-64 PBF powder, Amaero plans to produce Ti-64 powder with EIGA #1 and to
commence qualifications with multiple customers
Production is expected to commence by atomiser on the following schedule:
• EIGA #3: Q1 FY2027
• EIGA #1: Q1 FY2025
•
•
EIGA #2: Q2 FY2026
EIGA #4: Q2 FY2027
Exhibit 9: Estimated Production Schedule by Atomiser
Amaero Estimated PBF Powder Production Schedule
(FYE 06/30; Figures in tonnes) (Amounts are rounded)
96
81
-
FY2026E
Total PBF Production
101
10
EIGA #4
EIGA #2
EIGA #1
EIGA #4
-
EIGA #3
20
EIGA #3
EIGA #2
EIGA #1
EIGA #4
EIGA #3
FY2025E
101
67
11
EIGA #2
EIGA #1
17
101
FY2027E
Steady-State Production
Note, Steady-State Production indicates expected capacity production to be achieved after FY2027.
It should be noted that the estimated date for commencement of production by atomiser is subject to delay
due to potential risks that include availability of funding, delay in manufacturing and shipping of atomisers,
delay in testing and parameter optimization, delay in qualification of powder and lack of demand.
Amaero plans to prioritise production of C103, development refractory alloys and other high-value specialty
alloys in EIGA #1. For production planning, Amaero has based its production planning on the expected
commissioning period for the four planned atomisers and Fairmont’s estimate of total C103 PBF demand
and Amaero’s achievable market share. Pertaining to Fairmont’s estimate of Amaero’s achievable market
11
Source: Fairmont Consulting Group Report; ‘State of the PM Industry in North America—2023 June 2023’
Metal Powder Industries Federation; ‘Metal Additive Goes Full Scale’ SmarTech Analysis Core Metal AM Advisory Service.
Note: Values in AUD unless otherwise noted; assumed AUD:USD rate of 0.65.
share, the estimate takes into consideration the limited supplier base for U.S. domestic production, the lack
of production capacity that can be responsive with lead times and with smaller batch production runs and the
lack of proven atomization technologies that are capable of scaling powder production for refractory alloys.
As a powder producer of multiple alloys and more flexible production environment, Amaero is positioned to
adjust production runs based on final demand.
Total metal PBF powder production in North America in CY2022 was estimated at approximately 32 million
kgs with approximately 85% of production dedicated to commodity metals, including stainless steel (59%),
nickel alloys (12%), cobalt alloys (10%) and aluminum alloys (4%). Of total metal powder production, only
15% of production is dedicated to higher value powders – Ti-64 (12%) and specialty alloys (3%).
As specialty alloy powders comprise smaller volumes and require disruption to long production runs with
changeover between materials, commodity-oriented powder producers are not well suited for smaller batch,
higher value production runs. Further, certain of the atomisation equipment utilised to atomise stainless
steel, nickel and other powders is not capable of operating at a suffici
Share your feedback
Discover